Comparison ledger
Applied Materials 0010 47763, Lam Research TCP 9600 Metal, side by side. Every value shown is drawn from the cited encyclopedia entries.
| Attribute | 0010 47763Applied Materials | TCP 9600 MetalLam Research |
|---|---|---|
| OEM | Applied Materials | Lam Research |
| Category | Etch | Etch |
| Wafer size | — | — |
| Process node | — | — |
| Introduced | — | — |
| Production run | — | — |
| Lifecycle | — | — |
| Lifecycle milestones | — | — |
| Control system | — | — |
| Generation | — | — |
| Family | Applied Materials 0010 47763 | Lam Research TCP 9600 |
| Specifications | ||
| Configuration | 2nd Source New[1] | SMIF[4] |
| Type | Monopolar Dual Heated[2] | — |
| Description | ASSY, ESC, BONDED, MONOPOLAR DUAL HEATED[3] | — |
| Possible Materials | Al2O3 (aluminum oxide) or AlN (aluminum nitride)[2] | — |
| Model | 0010-47763[1] | — |
| OEM | Applied Materials[1] | — |
| Material (possible) | Al2O3 (aluminum oxide) or AlN (aluminum nitride)[2] | — |
| Application | Fixing wafers in etching process (PVD, CVD, ETCH)[2] | — |
| Quantity available (source) | 1[2] | — |
| Supported wafer sizes | — | 150mm (6 inch) and 200mm[5] |
| Process pressure range | — | 0 - 100 mTorr[6] |
| Top electrode power | — | 0 - 1250 W[6] |
| Lower electrode power | — | 0 - 1200 W[6] |
| Process temperature | — | 55 °C[6] |
| Process gases | — | Cl2, BCl3, HBr, SF6, CF4, Ar, N2, O2, He[6] |
| Endpoint detection | — | Adjustable monochromator[6] |
| Wafer clamp | — | Electrostatic chuck (ESC) with helium backside cooling[7] |
| Electrode gap | — | Fixed gap 8 inch TCP coil[7] |
| Number of RF generators | — | 3 (AE RFG 1250)[7] |
| Power supply requirements | — | 208V, 80A, 3-Phase, 50/60Hz[7] |
| DSQ strip module | — | Included[6] |
| Software version | — | Envision 1.6.1-012[7] |
| Aluminum etch rate | — | > 8000 Å/min[5] |
| Aluminum non-uniformity | — | +/- 15%[5] |
| System uptime | — | Typically > 85%[5] |
| Mean time to change (MTTC) | — | 12 hours[5] |
| Mean time between failures (MTBF) | — | > 125 hours[5] |
| Mean time to repair (MTTR) | — | < 4 hours[5] |