Waferpedia

Comparison ledger

Endura 2versus4400

Applied Materials Endura 2, Perkin Elmer 4400, side by side. Every value shown is drawn from the cited encyclopedia entries.

Documented as functional equivalents— Same function class: Deposition, null[1]
Side-by-side comparison of selected equipment models
Attribute
Endura 2Applied Materials
4400Perkin Elmer
OEMApplied MaterialsPerkin Elmer
CategoryDepositionDeposition
Wafer size——
Process node——
Introduced——
Production run——
Lifecycle——
Lifecycle milestones——
Control system——
Generation——
FamilyApplied Materials EnduraPerkin Elmer 44xx
Specifications
ConfigurationLiner / Barrier[2]Pump Exhaust GEEX[10]
Software Version2.10_692[4]—
System Power Rating208VAC/480VAC[4]—
Loading Configuration3 TDK Loadports[4]—
Chamber 1Impulse PVD[4]—
Chamber 2Impulse PVD[4]—
Chamber 3Impulse PVD[4]—
Chamber EDMD[4]—
Chamber FDMD[4]—
Fi RobotYasakawa[6]—
Wafer Carrier5x4" Wafer pocket, 4" Tray[9]—
SiC Tray4", 6 hole, SiC Carrier (2 pc)[9]—
Dry Pump(2)[9]—
Wafer Size12 inch (300 mm)[2]6 inch[13]
CategoryPVD (Physical Vapor Deposition)[2]—
Front Interface Version5.3[4]—
MainframeEndura II[4]—
Chamber Configuration3 Impulse PVD chambers (Chambers 1-3), 2 DMD chambers (Chambers E and F)[4]—
Robot TypeXP[2]—
PumpDedicated[2]—
Handler Type—Manual[10]
CDA—60-80 psi[10]
Chilled Water—68 F, 2 gpm[10]
N2—50 psi[10]
HPN2—60 psi[10]
HPAr—10 psi[10]
O2—10 psi[10]
Power—208 V, 3 Phase, 60 A[10]
Process Type—Sputtering / Physical Vapor Deposition[12]
Sputtering Types—DC, RF, DC-RF bias capable[11]
Target Positions—Ports for four targets; three utilized (two DC with RF bias, one RF)[11]
Load Lock—Yes[11]
RF Etch Option—Yes[11]
Pump - Main Chamber—Cryotorr 8 cryopump with CTI SC (air-cooled) He compressor[11]
Pump - Load Lock—Pfeiffer turbopump backed by Trivac rotary vane pump[11]
Roughing Pump—Ebara A10 roots pump[11]
Power Supply—Present[10]
AC Distribution Box—Present[10]
Heat Exchanger / Chiller—Present[10]
Backing Pump—Present[10]
Cryo Compressor—Present[10]
Mechanical Pump—Present[10]
CDA Supply—60-80 psi[10]
Chilled Water Supply—68 F, 2 gpm[10]
N2 Supply—50 psi[10]
HPN2 Supply—60 psi[10]
HPAr Supply—10 psi[10]
O2 Supply—10 psi[10]
Power Requirement—208 V, 3 Phase, 60 A[10]
Pump Exhaust—GEEX[10]
GEM / SECS—Present[10]
Cables—All cables present[10]
Standard Manual—Included[10]
CE Mark—No[10]
Vintage—2004[10]
Equipment type—Sputtering system[12]
Target ports—Four target ports[11]
Process modes—DC and RF, with DC-RF bias capable[11]
Options—RF etch option[11]
Load lock—Load lock[11]

Plan your fab

Building a Deposition process? Get a complete equipment list.

Open the fab equipment planner →
Sources (13)Every fact above is drawn from these public sources
  1. [1]web.archive.orgweb.archive.org
  2. [2]inventory listing
  3. [3]inventory listing
  4. [4]inventory listing
  5. [5]inventory listing
  6. [6]inventory listing
  7. [7]inventory listing
  8. [8]inventory listing
  9. [9]inventory listing
  10. [10]inventory listing
  11. [11]inventory listing
  12. [12]Equipment inventory listing
  13. [13]Equipment inventory listing